Momenteel zijn wij slecht bereikbaar. Er wordt hard aan gewerkt aan de oplossing. Onze excuses voor het ongemak.

Project Scheduling with Time Windows

From Theory to Applications

Paperback Engels 2002 9783790815160
€ 60,99
Levertijd ongeveer 9 werkdagen
Gratis verzonden

Samenvatting

Project Scheduling is concerned with the allocation of scarce resources over time. The rich optimisation models with time windows that are treated in this book cover a multitude of practical decision problems arising in diverse application areas such as construction engineering or make-to-order production planning.
The book shows how Constraint Propagation techniques from Artificial Intelligence can be successfully combined with Operations Research methods for developing powerful exact and heuristic solution algorithms for a very general class of scheduling problems. Example applications demonstrate the effectiveness of the approach.

Specificaties

ISBN13:9783790815160
Taal:Engels
Bindwijze:paperback
Aantal pagina's:166
Uitgever:Physica-Verlag HD

Lezersrecensies

Wees de eerste die een lezersrecensie schrijft!

Inhoudsopgave

1 Introduction.- 1.1 Motivation and Objectives.- 1.2 Outline.- 2. Optimisation Model.- 2.1 The General Single-Mode Model.- 2.1.1 Activities and Resources.- 2.1.2 Temporal Constraints.- 2.1.3 The Model.- 2.1.4 Schedules and Performance Measures.- 2.1.5 Domains of Decision Variables.- 2.1.6 Special Cases.- 2.2 Extension to Multiple Execution Modes.- 2.2.1 Modes.- 2.2.2 Resources.- 2.2.3 The Model.- 3 Constraint Propagation.- 3.1 Constraint Satisfaction and Optimisation.- 3.1.1 The Constraint Satisfaction Problem.- 3.1.2 The Constraint Optimisation Problem.- 3.1.3 Constraint Graphs.- 3.2 Concepts of Consistency.- 3.2.1 k-Consistency.- 3.2.2 Domain-Consistency.- 3.2.3 Bound Consistency.- 3.3 Consistency Checking.- 3.3.1 Consistency Tests.- 3.3.2 Consistency Checking Algorithms.- 3.3.3 Uniqueness of the Fixed Point.- 3.4 Constraint Programming.- 4 Consistency Tests.- 4.1 Basic Concepts.- 4.2 Consistency Tests for Temporal Constraints.- 4.3 Interval Consistency.- 4.4 Disjunctive Sub-Problems.- 4.4.1 Disjunctive Activity Pairs.- 4.4.2 Selection of Disjunctive Sub-Problems.- 4.5 Disjunctive Interval Consistency Tests.- 4.5.1 Input/Output Test.- 4.5.2 Input-or-Output Test.- 4.5.3 Input/Output Negation Test.- 4.5.4 Summary and Generalisation.- 4.5.5 Relation to Interval Consistency.- 4.5.6 Lower Level Consistency.- 4.5.7 Sequence Consistency Does Not Imply k-b-Consistency.- 4.5.8 Shaving.- 4.6 Cumulative Interval Consistency Tests.- 4.6.1 Unit-Interval Consistency.- 4.6.2 Activity Interval Consistency.- 4.6.3 Minimum Slack Intervals.- 4.6.4 Fully and Partially Elastic Relaxations.- 4.7 Multi-Mode Consistency Tests.- 4.8 Summary.- 5 A Branch-and-Bound Algorithm.- 5.1 Previous Solution Approaches.- 5.2 Constraint Propagation.- 5.2.1 Consistency Tests.- 5.2.2 Some Properties of the Earliest Start Times.- 5.3 The Branch-and-Bound Algorithm.- 5.3.1 The Branching Scheme.- 5.3.2 Upper and Lower Bounds.- 5.3.3 Some Properties of Active Schedules.- 5.4 Computational Experiments.- 5.4.1 Implementation of the Algorithm.- 5.4.2 Bidirectional Planning.- 5.4.3 Characteristics of the Test Sets.- 5.4.4 Experiments for the Problem PSItemplCmax.- 5.4.5 Experiments for the Problem PS1precIC,,,ax.- 5.5 Summary.- 6 Multi-Mode Extension of the Branch-and-Bound Algorithm.- 6.1 Previous Work.- 6.2 Constraint Propagation.- 6.3 Extended Branching Scheme.- 7 Applications in Airport Operations Management.- 7.1 Scheduling of Ground Handling Operations.- 7.2 Gate Scheduling.- 7.2.1 Introduction.- 7.2.2 Literature Review.- 7.2.3 Problem Description.- 7.2.4 Constraint Propagation.- 7.2.5 A Branch-and-Bound Algorithm.- 7.2.6 Lower Bounds.- 7.2.7 Problem Partitioning.- 7.2.8 Layered Branch-and-Bound.- 7.2.9 Large Neighbourhood Search.- 7.2.10 Computational Experiments.- 8 Summary and Conclusions.- List of Figures.- List of Tables.- List of Symbols.- References.

Managementboek Top 100

€ 60,99
Levertijd ongeveer 9 werkdagen
Gratis verzonden

Rubrieken

    Personen

      Trefwoorden

        Project Scheduling with Time Windows