<p style="MARGIN: 0px">(Total Level Hours: 167.5)</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">29103-09 Plasma Arc Cutting (PAC ) (10 Hours)</p> <p style="MARGIN: 0px">Explains plasma arc cutting equipment and safe work area preparation. Identifies correct amperage settings, gas</p> <p style="MARGIN: 0px">pressures, and flow rates. Covers plasma arc cutting methods for piercing, slotting, squaring, and beveling metals. Explains</p> <p style="MARGIN: 0px">how to store equipment and clean the work area.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34301-11 Boiler Pressure Components(25 Hours)</p> <p style="MARGIN: 0px">Describes the pressure components of a boiler system and their locations. Explains the procedures required to repair pressure</p> <p style="MARGIN: 0px">components of a boiler.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34302-11 Boiler Nonpressure Components (15 Hours)</p> <p style="MARGIN: 0px">Describes the nonpressure components of a boiler system and their locations. Explains the procedures required to repair</p> <p style="MARGIN: 0px">pressure components of a boiler.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34303-11 Boiler Auxiliaries (25 Hours)</p> <p style="MARGIN: 0px">Describes the air flow systems within a boiler system. Explains the different fuels used to fire boiler system furnaces. Describes</p> <p style="MARGIN: 0px">ash removal systems and the equipment used to protect the environment. Covers the feed water system into a boiler and</p> <p style="MARGIN: 0px">the blow down from a boiler system.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34304-11 BRIL (Brick, Refractory, Insulation, and Lagging) (5 Hours)</p> <p style="MARGIN: 0px">Describes the various types of BRIL and explains their functions. Also addresses the hazards associated with BRIL.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34305-11 Advanced Tube Work (20 Hours)</p> <p style="MARGIN: 0px">Explains the methods used to identify problem tubes and the methods used to extract them. Also describes the methods</p> <p style="MARGIN: 0px">used for replacing and plugging tubes.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34306-11 Testing Piping Systems and Equipment (20 Hours)</p> <p style="MARGIN: 0px">Lists pretest requirements for boiler system piping systems and equipment. Describes service and flow tests, head pressure</p> <p style="MARGIN: 0px">tests, and hydrostatic tests performed on boiler system piping systems and equipment.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34307-11 Rigging (22.5 Hours)</p> <p style="MARGIN: 0px">Describes common rigging hardware and equipment and how to inspect it. Identifies special rigging equipment. Covers</p> <p style="MARGIN: 0px">the knots used in rigging and the hand signals used to communicate with crane operators. Describes basic rigging and</p> <p style="MARGIN: 0px">crane safety procedures. Explains how to balance loads.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34308-11 Towers and Exchangers (25 Hours)</p> <p style="MARGIN: 0px">Explains the basic distillation process. Identifies various types of towers and their components. Explains the function of</p> <p style="MARGIN: 0px">various types of towers. Identifies various types of exchangers and their components. Explains exchanger functions.</p> <p style="MARGIN: 0px"> </p>