Pipeline Maintenance Trainee Guide, Level 2

Paperback Engels 2017 3e druk 9780134716534
€ 161,74
Levertijd ongeveer 9 werkdagen
Gratis verzonden

Samenvatting

This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes:

CT15_1-17 Visually Inspect Surface Conditions of Right-of-Way

CT16_1-17 Inspect Navigable Waterway Crossing

CT27_1-17 Routine Inspection of Breakout Tanks (API 653 monthly or DOT annual)
CT28_0-17 Provide Security for Pipeline Facilities

CT34_0-17 Inspect Existing Pipe Following Movement

CT37_0-17 Install or Repair Support Structures on Existing Above Ground Components

CT38_1-17 Visually Inspect Pipe and Pipe Components Prior to Installation

CT39_0-17 Backfilling a Trench Following Maintenance

CT52_1-17 Conduct Vegetation Survey

CT52_2-17 Conduct a Leak Survey with a CGD

CT52_3-17 Conduct a Leak Survey with a Flame Ionization Unit

CT59_0-17 Vault Maintenance (Gas)

CTCC-17 Cold Cutting

CTFB-17 Flange Bolting

CTMP-17 Mud Plugging

CTTB-17 Tubing

CTTP-17 Threaded Pipe Fabrication

Instructor Supplements

Instructors: Product supplements may be ordered via our ordering department at 1-800-922-0579 or directly through OASIS at http://oasis.pearson.com.

Instructor Access Card Provides access to PowerPoints, Lesson Plans and Performance Profile sheets

Instructor's Resource Card  ISBN: 9780134716558   

Price $100

Specificaties

ISBN13:9780134716534
Taal:Engels
Bindwijze:Paperback
Aantal pagina's:576
Druk:3

Lezersrecensies

Wees de eerste die een lezersrecensie schrijft!

Inhoudsopgave



CT15_1-17 Visually Inspect Surface Conditions of Right-of-Way

CT16_1-17 Inspect Navigable Waterway Crossing

CT27_1-17 Routine Inspection of Breakout Tanks (API 653 monthly or DOT annual)
CT28_0-17 Provide Security for Pipeline Facilities

CT34_0-17 Inspect Existing Pipe Following Movement

CT37_0-17 Install or Repair Support Structures on Existing Above Ground Components

CT38_1-17 Visually Inspect Pipe and Pipe Components Prior to Installation

CT39_0-17 Backfilling a Trench Following Maintenance

CT52_1-17 Conduct Vegetation Survey

CT52_2-17 Conduct a Leak Survey with a CGD

CT52_3-17 Conduct a Leak Survey with a Flame Ionization Unit

CT59_0-17 Vault Maintenance (Gas)

CTCC-17 Cold Cutting

CTFB-17 Flange Bolting

CTMP-17 Mud Plugging

CTTB-17 Tubing

CTTP-17 Threaded Pipe Fabrication


Managementboek Top 100

€ 161,74
Levertijd ongeveer 9 werkdagen
Gratis verzonden

Rubrieken

    Personen

      Trefwoorden

        Artikelen

          Pipeline Maintenance Trainee Guide, Level 2