Critical Path Analysis in Practice

Collected papers on project control

Gebonden Engels 2001 9780415264723
€ 308,13
Levertijd ± 11 werkdagen
Gratis verzonden

Samenvatting

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Specificaties

Lezersrecensies

Wees de eerste die een lezersrecensie schrijft!

Inhoudsopgave

Part I Review of Basic CPA Methods; 1. The Scope of the Method, D. WILLIAMS; 2. Introduction to the Basic Method, D. WILLIAMS; 3. The Method of Potentials, J. A. CARRUTHERS; Part II Early Problems of Implementation; 4. Introducing CPA into an Organization, R. COKER; 5. Optimum Level of Detail, H. WALTON; 6. The Use and Abuse of Computers, D. WILLIAMS; Part III Further Aspects of the Technique; 7. ::; 8. Probabilistic Times, J. A. CARRUTHERS; 9. Probabilistic Networks, C. STAFFURTH; ch0010 Network-based Cost Control, P. M. USHER, D. W. FORSYTH; Part IV Large Networks; 11. Major Problem Areas, E. L. BUESNEL; 12. Network Preparation, H. WALTON; 13. Monitoring, D. J. ARMSTRONG; 14. Communication, E. G. TRIMBLE; 15. Organization, R. C. J. TAYLOR; 16. Education and Training, E. L. BUESNEL; Part V Alternative Approaches to Network Problems; 17. Linear Programming and CPA, S. VAJDA; 18. A Note on the Transportation Formulation of CPA, J. A. CARRUTHERS;

Managementboek Top 100

€ 308,13
Levertijd ongeveer 11 werkdagen
Gratis verzonden

Rubrieken

Producten

    Auteurs

      Trefwoorden

        Artikelen

          Critical Path Analysis in Practice