How to Build a Work Breakdown Structure

The Cornerstone of Project Management

Paperback Engels 1999 1e druk 9781890367121
€ 37,55
Levertijd ± 11 werkdagen
Gratis verzonden

Samenvatting

While project managers are consistently expected to create the WBS as the cornerstone of their project plans, there are limited references on how to actually go about crafting one that works. This book provides readers with the different approaches to WBS construction, highlights the advantages and disadvantages of each of these approaches, examines the implications of the different styles of WBS and the level of depth that a project requires.

Specificaties

ISBN13:9781890367121
Taal:Engels
Bindwijze:Paperback
Aantal pagina's:56
Uitgever:CRC Press
Druk:1

Lezersrecensies

Wees de eerste die een lezersrecensie schrijft!

Managementboek Top 100

€ 37,55
Levertijd ongeveer 11 werkdagen
Gratis verzonden

Rubrieken

Producten

    Auteurs

      Trefwoorden

        Artikelen

          How to Build a Work Breakdown Structure